Residential Housing Development Project - Crescent Drive
Residential Housing Development Project - 25 Units Crescent Drive, Aldershot
Case Study – Aldershot Residential Community Development (25 Units)
Project Overview
In Aldershot, we successfully delivered a large-scale new-build residential community, comprising a total of 25 dwellings. This project required both technical construction expertise and the ability to manage complex planning, compliance, and design processes.
The development included:
-
7 × three-bedroom houses
-
3 × two-bedroom terraced townhouses
-
4 × four-bedroom townhouses
-
11-unit apartment block (8 × two-bedroom, 2-bath apartments and 3 × one-bedroom studios)
Our Role
Unlike many construction firms, our role went far beyond simply building. We were responsible for designing the plans, applying for planning permission, and managing compliance — all while leading the full construction and furnishing of the scheme. Working closely with our designated architect, who exclusively oversees our projects, we ensured a seamless transition from planning to delivery on site.
We also navigated complex obligations, including:
-
Section 106 housing association contributions (triggered by developments over 11 units)
-
Section 278 works (covering essential highway and infrastructure improvements)
1. Concept & Feasibility
-
Identified site potential and development opportunities
-
Conducted feasibility studies to ensure viability
-
Outlined project vision for a mixed residential community
2. Design & Planning
3. Regulatory Compliance & Approvals
Collaborated with our designated architect (who exclusively oversees our projects) to design high-quality, modern dwellings
-
Prepared and submitted planning applications for local authority approval
-
Streamlined the process from initial design to full planning consent
- Successfully navigated complex planning requirements, including:
-
Section 106 housing association contributions, triggered by developments over 11 units
-
Section 278 works, covering essential highway and infrastructure improvements
-
Management of all utility connections from sewage, water, gas, electric and open reach.
-
Liaised closely with local planning authorities and regulatory bodies LABC to ensure full compliance.
-
4. Pre-Construction Preparation
-
Finalised design specifications and build strategies
-
Coordinated with consultants, engineers, and suppliers
-
Established robust project timelines and budgets
5. Construction Phase
-
Delivered 7 three-bedroom houses, 3 two-bedroom terraced townhouses, and 4 four-bedroom townhouses.
-
Began construction of the apartment block, initially approved for 8 units
-
Paused construction strategically to apply for additional planning consent, successfully securing 3 extra apartments (total: 11 units — 8 two-bedroom, 2-bath apartments and 3 one-bedroom studios)
-
Although this introduced delays, it enhanced the value and density of the development
-
Oversaw all aspects of structural work, utilities, landscaping and section 278 works in finishing with strict quality control
6. Handover & Completion
-
Key Achievements – Aldershot Residential Community Development
-
End-to-end delivery: Managed the full process from design, planning permission, and compliance through to construction and furnishing.
-
Strategic planning gain: Secured an additional 3 apartments mid-construction, increasing the scheme from 8 to 11 units and significantly enhancing the project’s overall value and housing provision.
-
Complex project management: Successfully coordinated multiple property types (houses, townhouses, and apartments) within one cohesive development.
-
High specification build: Delivered all dwellings to modern, high-quality standards with durable finishes and functional layouts.
-
Planning expertise: Navigated and fulfilled complex obligations, including Section 106 housing association contributions and Section 278 highways works.
-
Community impact: Created a vibrant new residential community of 25 dwellings, balancing family homes with high-quality apartments.
-
Added value: Demonstrated ability to adapt plans mid-project, overcoming delays to unlock greater long-term benefits for both the client and the community.